Raytheon

January 16, 2020
 

Raytheon Co., Marlborough, Massachusetts, has been awarded a $36,848,806 cost-plus-fixed-fee contract modification (P00152) for the software encryption platform (SEP) engineering change effort, under the Family of Advanced Beyond Line-of-Sight Terminals (FAB-T) production contract. The contract action will develop and deliver an updated National Security Agency approved SEP. Work will be performed at Marlborough, Massachusetts, and is expected to be completed by March 2023. This award is the result of a sole source acquisition. Fiscal year 2019 research, development, test and evaluation funding in the amount of $1,000,000 is being obligated at the time of award.

January 16, 2020
 

Raytheon Co., Marlborough, Massachusetts, is awarded a $442,265,464 cost-plus-incentive-fee undefinitized contract action for the force element terminal (FET) development effort. This contract provides for the design, development, testing, integration, and logistical support of a FET system that will transition the B-52 and RC-135 hardened communication terminals from the Military Strategic Tactical Relay satellite communications satellite constellation to the Advanced Extremely High Frequency satellite constellation. The majority of the work will be performed at Raytheon's facilities in Marlborough, Massachusetts; and Largo, Florida, and is expected to be completed by August 2023. The award is the result of a sole-source acquisition.

December 6, 2019
 

Raytheon Co. Space and Airborne Systems, McKinney, Texas, has been awarded a $13,121,979 modification (P00002) to previously awarded agreement FA8650-19-9-9326 for High Energy Laser Weapon Systems (HELWS). This modification provides for the purchase of one additional HELWS being produced under the basic agreement, including outside continental U.S.

October 18, 2019
 

Raytheon Co., McKinney, Texas, is awarded a $17,897,746 cost-plus-incentive-fee order (N00019-20-F-0277) against a previously issued basic ordering agreement (N00019-15-G-0003). This order procures Advanced Targeting Forward Looking Infrared special test equipment updates to the Windows 10 operating system in support of the F/A-18E/F aircraft. Work will be performed in McKinney, Texas, and is expected to be completed in February 2022. Fiscal year 2018 aircraft procurement (Navy) funds in the amount of $17,897,746 will be obligated at time of award, all of which will expire at the end of the current fiscal year. The Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity.

September 25, 2019
 

Raytheon Co., El Segundo, California, has been awarded a $10,942,488 cost-plus-fixed-fee contract for Technologies for the Mixed-mode Ultra Scaled Integrated Circuits (T-MUSIC) effort. This effort will develop advanced mixed-mode RF components and sub-systems leveraging the T-MUSIC platform. T-MUSIC technology combines advanced silicon-germanium with advanced CMOS to enable ultra-wide bandwidth, high spurious free dynamic range and fine data converter resolution with high effective number of bits beyond current state-of-the-art. Work will be performed at El Segundo, California; Andover, Maryland; and Thousand Oaks, California, and is expected to be completed Dec. 20, 2023.

September 25, 2019
 

Raytheon Co. Missile Systems, Tucson, Arizona, has been awarded a $16,289,702 agreement for one prototype Phaser high power microwave system. This agreement provides for outside continental U.S. (OCONUS) field assessment for purposes of experimentation. Experimentation includes, but is not limited to 12 months of in-field operation by Air Force personnel against unmanned aerial systems threats.

September 25, 2019
 

Raytheon Integrated Defense Systems, Woburn, Massachusetts, is being awarded a modification on indefinite-delivery/indefinite-quantity contract HQ0147-18-D-0002. The value of this contract modification is $500,615,405, which increases the total ceiling value from $461,492,695 to $962,108,100. The contractor will continue to perform research and development support for the Army Navy Transportable Radar Surveillance Control Model-2 and Sea-Based X-Band radar. The modification also includes continued product improvement, warfighter support, engineering services, Ballistic Missile Defense System test subject matter experts (SME) support, modeling and simulation SME support, and cybersecurity. No task orders are being issued at this time.

September 13, 2019
 

Raytheon Co., McKinney, Texas, was awarded a $427,298,588 hybrid (cost-plus-fixed-fee and firm-fixed-price) contract for procurement of Common Sensor Payload systems, spare parts and engineering and system support services. One bid was were solicited with one bid received. Work locations and funding will be determined with each order, with an estimated completion date of September 12, 2024. U.S. Army Contracting Command, Aberdeen Proving Ground, Maryland, is the contracting activity (W56KGY-19-D-0005).

September 13, 2019
 

Raytheon Lockheed Martin Javelin JV, Tucson, Arizona, was awarded an $185,601,502 firm-fixed-price contract for the Javelin Weapon System full rate production, All Up Rounds, Command Launch Unit retrofits, battery coolant units, Javelin outdoor trainers, outdoor trainer instruction station, tripods, Javelin vehicle launcher and electronics.  Bids were solicited via the internet with one received. Work will be performed in Tucson, Arizona, with an estimated completion date of August 31, 2023.  Fiscal year 2018 and 2019 research, development, test and evaluation; Navy procurement; Marine Corps procurement; and missile procurement, Army funds in the combined amount of $185,601,502 were obligated at the time of the award. U.S.

September 3, 2019
 

Raytheon, Tucson, Arizona, is awarded $246,495,123 for an undefinitized contract action, performance-based logistics requirements contract for repair, upgrade, or replacement, required availability, required reliability, configuration management, inventory management and obsolescence management in support of the Close-In Weapon System, Land-based Phalanx Weapon System, Rolling Airframe Missile (RAM) and SeaRAM. This contract includes a two-year base period with one three-year option, which if exercised, will bring the contract ceiling value to $466,395,931. Work will be performed in Louisville, Kentucky, and work is expected to be completed by August 2021; if the option is exercised, work will be completed by August 2024.

September 3, 2019
 

Tucson-based Raytheon Company announced that it would be a subcontractor helping to enhance the flight performance of the Army's hypersonic weapon glide body. Under Dynetics Corporation contracts with the service, Raytheon will build and deliver the control, actuation and power-conditioning subassemblies that control flight of the Army's new Common-Hypersonic Glide Body program. Raytheon will also help assemble and test the new glide body under the Dynetics Corporation contracts. 

August 30, 2019
 

Raytheon Integrated Defense Systems, Fullerton, California, was awarded a $9,306,511 modification (P00010) to contract W31P4Q-19-C-0044 for field service representatives to deploy, operate, and sustain Sentinel Radars. Work will be performed in Fullerton, California, with an estimated completion date of December 31, 2020. Fiscal year 2019 other procurement, Army funds in the amount of $9,306,511 were obligated at the time of the award. U.S. Army Contracting Command, Redstone Arsenal, Alabama, is the contracting activity.

August 26, 2019
 

Raytheon Co., El Segundo, California, is awarded $74,091,217 for cost-plus-incentive-fee, cost-plus-fixed-fee modification P00055 to a previously awarded contract (N00019-16-C-0002). This modification procures pre-operational support for the Next Generation Jammer-Mid Band pod through the completion of the engineering, manufacturing and development (EMD) phase as well as development, test and evaluation (DT&E) activities. Procured support includes organizational-level maintenance, repair, supply chain management, and material support for equipment delivered under the EMD contract, and associated peculiar support equipment/test, measurement, and diagnostic equipment to support DT&E. Work will be performed in Forest, Mississippi (3

August 22, 2019
 

Raytheon Co., Intelligence, Information and Services, Indianapolis, Indiana, is awarded a $29,919,648 cost-plus-fixed-fee order (N00421-19-F-0531) against a previously issued basic ordering agreement (N00019-15-G-0003).  This order provides for the procurement of V-22 Software Support Activity (SSA) systems and software engineering, avionics integration and testing, software testing, avionics acquisition support, and SSA operations to include classified and unclassified laboratories, configuration and data management, and release of avionics software products and related systems. Work will be performed in Indianapolis, Indiana, and is expected to be completed in December 2021.  Fiscal year 2017 and 2019 aircraft procurement (Navy); FY201

August 22, 2019
 

Raytheon Integrated Defense Systems, was awarded a $23,995,308 modification (P00005) to contract W31P4Q-19-C-0021 for acquisition of a production contract for signal data processor kits for Sentinel A3 radars. Work will be performed in Fullerton, California, with an estimated completion date of July 31, 2021. Fiscal year 2019 other procurement, Army funds in the amount of $23,995,308 were obligated at the time of the award. U.S. Army Contracting Command, Redstone Arsenal, Alabama, is the contracting activity.

August 15, 2019
 

Raytheon Lockheed Martin Javelin JV, Tucson, Arizona, was awarded an $11,100,544 modification (P00017) to contract W31P4Q-19-C-0038 for engineering services for the Spiral 3 Test and Evaluation Plan, Spiral 3 System Hardware Qualification, and Worldwide Ammunition Reporting System requirements to support the Javelin Missile System. Work will be performed in Tucson, Arizona, with an estimated completion date of September 1, 2021. Fiscal year 2019 missile procurement, Army funds in the amount of $11,100,544 were obligated at the time of the award. U.S. Army Contracting Command, Redstone Arsenal, Alabama, is the contracting activity.

August 8, 2019
 

Raytheon Co., Keyport, Washington, is awarded $11,738,000 for firm-fixed-priced undefinitized delivery order N00024-19-F-6308 under indefinite-delivery/indefinite-quantity contract N61331-17-D-0001for deploy and retrieve systems in support of the AN/AQS-20 program. The highly specialized equipment under this contract will deploy, tow and retrieve the AN/AQS-20 sonar in support of mine hunting operations. The AN/AQS-20 is an advanced mine hunting sonar for the Littoral Combat Ship's Mine Countermeasures Mission package. Work will be performed in Keyport, Washington (90%); and Portsmouth, Rhode Island (10%), and is expected to be complete by October 2020.

August 6, 2019
 

Raytheon Co., Goleta, California, was awarded a modification to exercise an option totaling $8,263,421 to previously awarded contract HR0011-19-C-0010 for a Defense Advanced Research Projects Agency research project. The modification brings the total cumulative face value of the contract from $4,334,736 to $12,598,157. Work will be performed in Goleta, California; Waltham, Massachusetts; Irvine, California; Oxnard, California; and Joplin, Missouri, with an expected completion date of November 4, 2020. Fiscal year 2018 and 2019 research, development, test and evaluation funds in the amount of $6,723,915 are being obligated at time of award. The Defense Advanced Research Projects Agency, Arlington, Virginia, is the contracting activity

July 31, 2019
 

Raytheon Integrated Defense Systems, Fullerton, California, was awarded a $160,814,850 cost-plus-fixed-fee contract for engineering and technical services to support the Sentinel Radar. Bids were solicited via the internet with one received. Work locations and funding will be determined with each order, with an estimated completion date of July 31, 2019. U.S. Army Contracting Command, Redstone Arsenal, Alabama, is the contracting activity (W31P4Q-19-D-0030).

July 30, 2019
 

Raytheon Integrated Defense Systems, Marlborough, Massachusetts, is awarded a $14,296,116 firm-fixed-price, definite-quantity contract action for production of AN/SPY-1 radar solid state switch assembly modification kits.  Work will be performed in Marlborough, Massachusetts, and is expected to be complete by November 2021. Fiscal year 2019 other procurement (Navy) funding in the amount of $14,296,116 will be obligated at time of award and will not expire at the end of the current fiscal year.  This contract was not competitively procured in accordance with 10 U.S.

Pages